Performance of pilot-scale vertical-flow constructed wetlands, as affected by season, substrate, hydraulic load and frequency of application of simulated urban sewage

C. A. Prochaska, A. I. Zouboulis, K. M. Eskridge

Research output: Contribution to journalArticle

90 Citations (Scopus)

Abstract

The effects of major operational factors on the performance of vertical-flow pilot-scale constructed wetlands (VFPCWs) were examined in parallel experiments. Experiments were conducted for one year in eight VFPCWs, the main substrate of which consisted of river sand at four of the wetlands, or a mixture of sand and dolomite (10:1 weight ratio) at the other four wetlands. Medium-strength synthetic sewage was applied as influent. A Latin square (balanced for carryover effects) split-plot experimental design was used. The ANOVA statistical model was applied to analyze the relationships between the main operational factors and the effluent COD, NO2-N, NO3-N, TN and PO4-P concentrations. It was found that the effluent concentrations of these parameters were related to the examined factors, as well as to the combined effects of certain influencing factors. The results demonstrated that the VFPCWs operating with relatively small hydraulic load per batch (0.08 m3 m-2), and applied on the wetlands with low batch frequency (two times per week), could result in high COD removal (more than 92%) and sufficient nitrification (more than 60% of TN was transformed to NO3-N). However, the addition of dolomite in the substrate did not significantly affect the overall phosphorus removal, which remained in the range of 39-64%.

Original languageEnglish (US)
Pages (from-to)57-66
Number of pages10
JournalEcological Engineering
Volume31
Issue number1
DOIs
StatePublished - Sep 1 2007

Fingerprint

constructed wetlands
Wetlands
Sewage
constructed wetland
sewage
fluid mechanics
wetlands
dolomite
wetland
Hydraulics
hydraulics
substrate
effluents
Substrates
sand
effluent
statistical models
strength (mechanics)
nitrification
experimental design

Keywords

  • ANOVA
  • COD removal
  • Dolomite
  • Nitrification
  • Phosphorus removal
  • Synthetic sewage
  • Vertical-flow constructed wetlands

ASJC Scopus subject areas

  • Environmental Engineering
  • Nature and Landscape Conservation
  • Management, Monitoring, Policy and Law

Cite this

@article{f7bc6caf95b641b4be9e8c545005cf26,
title = "Performance of pilot-scale vertical-flow constructed wetlands, as affected by season, substrate, hydraulic load and frequency of application of simulated urban sewage",
abstract = "The effects of major operational factors on the performance of vertical-flow pilot-scale constructed wetlands (VFPCWs) were examined in parallel experiments. Experiments were conducted for one year in eight VFPCWs, the main substrate of which consisted of river sand at four of the wetlands, or a mixture of sand and dolomite (10:1 weight ratio) at the other four wetlands. Medium-strength synthetic sewage was applied as influent. A Latin square (balanced for carryover effects) split-plot experimental design was used. The ANOVA statistical model was applied to analyze the relationships between the main operational factors and the effluent COD, NO2-N, NO3-N, TN and PO4-P concentrations. It was found that the effluent concentrations of these parameters were related to the examined factors, as well as to the combined effects of certain influencing factors. The results demonstrated that the VFPCWs operating with relatively small hydraulic load per batch (0.08 m3 m-2), and applied on the wetlands with low batch frequency (two times per week), could result in high COD removal (more than 92{\%}) and sufficient nitrification (more than 60{\%} of TN was transformed to NO3-N). However, the addition of dolomite in the substrate did not significantly affect the overall phosphorus removal, which remained in the range of 39-64{\%}.",
keywords = "ANOVA, COD removal, Dolomite, Nitrification, Phosphorus removal, Synthetic sewage, Vertical-flow constructed wetlands",
author = "Prochaska, {C. A.} and Zouboulis, {A. I.} and Eskridge, {K. M.}",
year = "2007",
month = "9",
day = "1",
doi = "10.1016/j.ecoleng.2007.05.007",
language = "English (US)",
volume = "31",
pages = "57--66",
journal = "Ecological Engineering",
issn = "0925-8574",
publisher = "Elsevier",
number = "1",

}

TY - JOUR

T1 - Performance of pilot-scale vertical-flow constructed wetlands, as affected by season, substrate, hydraulic load and frequency of application of simulated urban sewage

AU - Prochaska, C. A.

AU - Zouboulis, A. I.

AU - Eskridge, K. M.

PY - 2007/9/1

Y1 - 2007/9/1

N2 - The effects of major operational factors on the performance of vertical-flow pilot-scale constructed wetlands (VFPCWs) were examined in parallel experiments. Experiments were conducted for one year in eight VFPCWs, the main substrate of which consisted of river sand at four of the wetlands, or a mixture of sand and dolomite (10:1 weight ratio) at the other four wetlands. Medium-strength synthetic sewage was applied as influent. A Latin square (balanced for carryover effects) split-plot experimental design was used. The ANOVA statistical model was applied to analyze the relationships between the main operational factors and the effluent COD, NO2-N, NO3-N, TN and PO4-P concentrations. It was found that the effluent concentrations of these parameters were related to the examined factors, as well as to the combined effects of certain influencing factors. The results demonstrated that the VFPCWs operating with relatively small hydraulic load per batch (0.08 m3 m-2), and applied on the wetlands with low batch frequency (two times per week), could result in high COD removal (more than 92%) and sufficient nitrification (more than 60% of TN was transformed to NO3-N). However, the addition of dolomite in the substrate did not significantly affect the overall phosphorus removal, which remained in the range of 39-64%.

AB - The effects of major operational factors on the performance of vertical-flow pilot-scale constructed wetlands (VFPCWs) were examined in parallel experiments. Experiments were conducted for one year in eight VFPCWs, the main substrate of which consisted of river sand at four of the wetlands, or a mixture of sand and dolomite (10:1 weight ratio) at the other four wetlands. Medium-strength synthetic sewage was applied as influent. A Latin square (balanced for carryover effects) split-plot experimental design was used. The ANOVA statistical model was applied to analyze the relationships between the main operational factors and the effluent COD, NO2-N, NO3-N, TN and PO4-P concentrations. It was found that the effluent concentrations of these parameters were related to the examined factors, as well as to the combined effects of certain influencing factors. The results demonstrated that the VFPCWs operating with relatively small hydraulic load per batch (0.08 m3 m-2), and applied on the wetlands with low batch frequency (two times per week), could result in high COD removal (more than 92%) and sufficient nitrification (more than 60% of TN was transformed to NO3-N). However, the addition of dolomite in the substrate did not significantly affect the overall phosphorus removal, which remained in the range of 39-64%.

KW - ANOVA

KW - COD removal

KW - Dolomite

KW - Nitrification

KW - Phosphorus removal

KW - Synthetic sewage

KW - Vertical-flow constructed wetlands

UR - http://www.scopus.com/inward/record.url?scp=34547125614&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=34547125614&partnerID=8YFLogxK

U2 - 10.1016/j.ecoleng.2007.05.007

DO - 10.1016/j.ecoleng.2007.05.007

M3 - Article

AN - SCOPUS:34547125614

VL - 31

SP - 57

EP - 66

JO - Ecological Engineering

JF - Ecological Engineering

SN - 0925-8574

IS - 1

ER -