Innovative System for Curved Precast Posttensioned Concrete I-Girder and U-Girder Bridges

M. Alawneh, M. Tadros, George Morcous

Research output: Contribution to journalArticle

Abstract

A new system for framing curved bridges using precast prestressed concrete girders is introduced. The main feature of the new system is the use of relatively short [6-12 m (20-40 ft)] straight girder segments that are joined and posttensioned to form a full-length curved girder. The visual impact of the deviation of these chords from a true curve is indistinguishable by a casual observer. However, it greatly simplifies production of precast curved girders, which are currently produced in full-span piece lengths. Another feature of the new system is utilization of two of the most commonly used precast concrete girder shapes: I-girder and U-girder. The straight-line bridge girder forms and prestressing bed can be used for the proposed curved girder system, saving considerable initial capital and allowing more precasters to compete for this type of bridge. The result is a better value of the cost-effective precast concrete stringer system compared to curved steel, cast-in-place concrete, and segmental precast systems. This paper presents the components of the new system and proposed construction stages. It also presents an overview of the analytical and experimental investigations conducted to evaluate the constructability and structural performance of the proposed system. Preliminary design aids are presented to assist in determining suitable girder size for different span lengths and radii of curvature.

Original languageEnglish (US)
Article number04016076
JournalJournal of Bridge Engineering
Volume21
Issue number11
DOIs
StatePublished - Nov 1 2016

Fingerprint

Precast concrete
Concrete beams and girders
Cast in place concrete
Design aids
Stringers
Prestressing
Beams and girders
Prestressed concrete
Steel
Costs

Keywords

  • Chorded girders
  • Curved bridges
  • Curved girders
  • I-girders
  • Posttensioning
  • Precast concrete girders
  • Torsional stresses
  • U-girders

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Building and Construction

Cite this

Innovative System for Curved Precast Posttensioned Concrete I-Girder and U-Girder Bridges. / Alawneh, M.; Tadros, M.; Morcous, George.

In: Journal of Bridge Engineering, Vol. 21, No. 11, 04016076, 01.11.2016.

Research output: Contribution to journalArticle

@article{4855267d8ea34e60b2ca06e2a78286b9,
title = "Innovative System for Curved Precast Posttensioned Concrete I-Girder and U-Girder Bridges",
abstract = "A new system for framing curved bridges using precast prestressed concrete girders is introduced. The main feature of the new system is the use of relatively short [6-12 m (20-40 ft)] straight girder segments that are joined and posttensioned to form a full-length curved girder. The visual impact of the deviation of these chords from a true curve is indistinguishable by a casual observer. However, it greatly simplifies production of precast curved girders, which are currently produced in full-span piece lengths. Another feature of the new system is utilization of two of the most commonly used precast concrete girder shapes: I-girder and U-girder. The straight-line bridge girder forms and prestressing bed can be used for the proposed curved girder system, saving considerable initial capital and allowing more precasters to compete for this type of bridge. The result is a better value of the cost-effective precast concrete stringer system compared to curved steel, cast-in-place concrete, and segmental precast systems. This paper presents the components of the new system and proposed construction stages. It also presents an overview of the analytical and experimental investigations conducted to evaluate the constructability and structural performance of the proposed system. Preliminary design aids are presented to assist in determining suitable girder size for different span lengths and radii of curvature.",
keywords = "Chorded girders, Curved bridges, Curved girders, I-girders, Posttensioning, Precast concrete girders, Torsional stresses, U-girders",
author = "M. Alawneh and M. Tadros and George Morcous",
year = "2016",
month = "11",
day = "1",
doi = "10.1061/(ASCE)BE.1943-5592.0000938",
language = "English (US)",
volume = "21",
journal = "Journal of Bridge Engineering",
issn = "1084-0702",
publisher = "American Society of Civil Engineers (ASCE)",
number = "11",

}

TY - JOUR

T1 - Innovative System for Curved Precast Posttensioned Concrete I-Girder and U-Girder Bridges

AU - Alawneh, M.

AU - Tadros, M.

AU - Morcous, George

PY - 2016/11/1

Y1 - 2016/11/1

N2 - A new system for framing curved bridges using precast prestressed concrete girders is introduced. The main feature of the new system is the use of relatively short [6-12 m (20-40 ft)] straight girder segments that are joined and posttensioned to form a full-length curved girder. The visual impact of the deviation of these chords from a true curve is indistinguishable by a casual observer. However, it greatly simplifies production of precast curved girders, which are currently produced in full-span piece lengths. Another feature of the new system is utilization of two of the most commonly used precast concrete girder shapes: I-girder and U-girder. The straight-line bridge girder forms and prestressing bed can be used for the proposed curved girder system, saving considerable initial capital and allowing more precasters to compete for this type of bridge. The result is a better value of the cost-effective precast concrete stringer system compared to curved steel, cast-in-place concrete, and segmental precast systems. This paper presents the components of the new system and proposed construction stages. It also presents an overview of the analytical and experimental investigations conducted to evaluate the constructability and structural performance of the proposed system. Preliminary design aids are presented to assist in determining suitable girder size for different span lengths and radii of curvature.

AB - A new system for framing curved bridges using precast prestressed concrete girders is introduced. The main feature of the new system is the use of relatively short [6-12 m (20-40 ft)] straight girder segments that are joined and posttensioned to form a full-length curved girder. The visual impact of the deviation of these chords from a true curve is indistinguishable by a casual observer. However, it greatly simplifies production of precast curved girders, which are currently produced in full-span piece lengths. Another feature of the new system is utilization of two of the most commonly used precast concrete girder shapes: I-girder and U-girder. The straight-line bridge girder forms and prestressing bed can be used for the proposed curved girder system, saving considerable initial capital and allowing more precasters to compete for this type of bridge. The result is a better value of the cost-effective precast concrete stringer system compared to curved steel, cast-in-place concrete, and segmental precast systems. This paper presents the components of the new system and proposed construction stages. It also presents an overview of the analytical and experimental investigations conducted to evaluate the constructability and structural performance of the proposed system. Preliminary design aids are presented to assist in determining suitable girder size for different span lengths and radii of curvature.

KW - Chorded girders

KW - Curved bridges

KW - Curved girders

KW - I-girders

KW - Posttensioning

KW - Precast concrete girders

KW - Torsional stresses

KW - U-girders

UR - http://www.scopus.com/inward/record.url?scp=84991830662&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84991830662&partnerID=8YFLogxK

U2 - 10.1061/(ASCE)BE.1943-5592.0000938

DO - 10.1061/(ASCE)BE.1943-5592.0000938

M3 - Article

VL - 21

JO - Journal of Bridge Engineering

JF - Journal of Bridge Engineering

SN - 1084-0702

IS - 11

M1 - 04016076

ER -