Evolving rehabilitation strategies for asphalt pavement

Wayne G. Jensen, Robert C. Rea, Mick S. Syslo

Research output: Contribution to journalArticle

3 Citations (Scopus)

Abstract

Strategies for rehabilitation of flexible pavements have traditionally included mill and overlay or reconstruction. Three new strategies for flexible pavement rehabilitation currently being utilised by the Nebraska Department of Roads include partial depth in-place recycling, full depth in-place recycling and full-depth reclamation. Cost differences between the new and the traditional strategies were evaluated and conditions under which the new strategies are appropriate for use are discussed in this paper. A comparison based upon cost of rehabilitating a section of pavement using the two conventional and three new strategies found that the three recycling strategies provide flexible pavement which costs more than mill and overlay but less than complete reconstruction.

Original languageEnglish (US)
Pages (from-to)257-264
Number of pages8
JournalInternational Journal of Pavement Engineering
Volume9
Issue number4
DOIs
StatePublished - Aug 1 2008

Fingerprint

Asphalt pavements
Pavements
Patient rehabilitation
Pavement overlays
Recycling
Costs
Reclamation

Keywords

  • Pavement rehabilitation
  • Reclamation
  • Reconstruction
  • Recycling

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Mechanics of Materials

Cite this

Evolving rehabilitation strategies for asphalt pavement. / Jensen, Wayne G.; Rea, Robert C.; Syslo, Mick S.

In: International Journal of Pavement Engineering, Vol. 9, No. 4, 01.08.2008, p. 257-264.

Research output: Contribution to journalArticle

Jensen, Wayne G. ; Rea, Robert C. ; Syslo, Mick S. / Evolving rehabilitation strategies for asphalt pavement. In: International Journal of Pavement Engineering. 2008 ; Vol. 9, No. 4. pp. 257-264.
@article{e6d870f4aacf43bbb0570e19ae2177c2,
title = "Evolving rehabilitation strategies for asphalt pavement",
abstract = "Strategies for rehabilitation of flexible pavements have traditionally included mill and overlay or reconstruction. Three new strategies for flexible pavement rehabilitation currently being utilised by the Nebraska Department of Roads include partial depth in-place recycling, full depth in-place recycling and full-depth reclamation. Cost differences between the new and the traditional strategies were evaluated and conditions under which the new strategies are appropriate for use are discussed in this paper. A comparison based upon cost of rehabilitating a section of pavement using the two conventional and three new strategies found that the three recycling strategies provide flexible pavement which costs more than mill and overlay but less than complete reconstruction.",
keywords = "Pavement rehabilitation, Reclamation, Reconstruction, Recycling",
author = "Jensen, {Wayne G.} and Rea, {Robert C.} and Syslo, {Mick S.}",
year = "2008",
month = "8",
day = "1",
doi = "10.1080/10298430701690454",
language = "English (US)",
volume = "9",
pages = "257--264",
journal = "International Journal of Pavement Engineering",
issn = "1029-8436",
publisher = "Taylor and Francis Ltd.",
number = "4",

}

TY - JOUR

T1 - Evolving rehabilitation strategies for asphalt pavement

AU - Jensen, Wayne G.

AU - Rea, Robert C.

AU - Syslo, Mick S.

PY - 2008/8/1

Y1 - 2008/8/1

N2 - Strategies for rehabilitation of flexible pavements have traditionally included mill and overlay or reconstruction. Three new strategies for flexible pavement rehabilitation currently being utilised by the Nebraska Department of Roads include partial depth in-place recycling, full depth in-place recycling and full-depth reclamation. Cost differences between the new and the traditional strategies were evaluated and conditions under which the new strategies are appropriate for use are discussed in this paper. A comparison based upon cost of rehabilitating a section of pavement using the two conventional and three new strategies found that the three recycling strategies provide flexible pavement which costs more than mill and overlay but less than complete reconstruction.

AB - Strategies for rehabilitation of flexible pavements have traditionally included mill and overlay or reconstruction. Three new strategies for flexible pavement rehabilitation currently being utilised by the Nebraska Department of Roads include partial depth in-place recycling, full depth in-place recycling and full-depth reclamation. Cost differences between the new and the traditional strategies were evaluated and conditions under which the new strategies are appropriate for use are discussed in this paper. A comparison based upon cost of rehabilitating a section of pavement using the two conventional and three new strategies found that the three recycling strategies provide flexible pavement which costs more than mill and overlay but less than complete reconstruction.

KW - Pavement rehabilitation

KW - Reclamation

KW - Reconstruction

KW - Recycling

UR - http://www.scopus.com/inward/record.url?scp=47749137444&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=47749137444&partnerID=8YFLogxK

U2 - 10.1080/10298430701690454

DO - 10.1080/10298430701690454

M3 - Article

AN - SCOPUS:47749137444

VL - 9

SP - 257

EP - 264

JO - International Journal of Pavement Engineering

JF - International Journal of Pavement Engineering

SN - 1029-8436

IS - 4

ER -